A
1724 9/17/2005 8:49:32 AM 9/17/2005 TechTalk Staff TechTalk@newellcoach.com Air Conditioning A critical factor in a properly designed central air system is the ductwork. The incorporation of multiple slide-outs greatly interfers with a proper layout for the supply air ducts in the side walls of the coach. A good supply air duct system is all but impossible in a four-slide coach. Since the majority of orders for new Newells specifiy four slide-outs, roof air conditioners has become the system of choice. The tranisition to roof a/c's was aided by the new roof designs that all but hide the a/c's from sight.
__________________
Ken
Previous Owner of 3 Newell's
Wanted: Newell Coach Needing Engine Replacement!
If you want to sell, PM or Private Message me. Thanks!
"I know I’m not perfect, and I don't live to be. But before you start pointing fingers, make sure your hands are clean."
-Bob Marley
|