Well I decided to beef up the structure, also fixing the sag. I ran a piece of 1x1 along the outside edge then sistered another 1-1/2 tubing along side. then tied all of it together with the cross members. Sealed it all then put a coat of POR15 on everything. Tomorrow ill put a sealer strip on top of the supports then install 3/16 aluminum sheets on top with stainless rivets, then seal it in.
My tanks and plumbing are next....
__________________
Keith, Krista and Family
77 38' Newell Coach Repowered from Smokin' V555TA To 325hp 8.3 inline 6 cummins, Allison 3000 series trans
87 40' Newell Coach 475hp 8V92 DD(sold)
22' 350hp Jet Riverboat
79 Ford F250 4x4
Many others to list
|