Concrete slab thickness for a newell - Luxury Coach Lifestyles
Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×
Reply
 
Thread Tools Display Modes
 
Old 08-19-2012, 06:51 PM   #1
Newellin Thunder
Senior Member
 
Newellin Thunder's Avatar
 
Join Date: Aug 2012
Posts: 130
Default Concrete slab thickness for a newell

Do I really need anything more than a 4" concrete slab to support a RV? I am preparing to put up a shop large enough to house the Newell and it was recommended that I put a 5-6 inch slab of concrete to support the weight of the Newell. Is this correct or will 4" be just fine.
__________________

__________________
Ernest Jenkins

2005 Newell Thunder
Shakin the open road!
Newellin Thunder is offline   Reply With Quote
Old 08-19-2012, 07:47 PM   #2
jack14r
Senior Member
 
jack14r's Avatar
 
Join Date: Nov 2010
Location: greensboro,nc
Posts: 111
Default

I have 6 inch in my shop and I wish I had 8 inches because of cracks,maybe I should have used 4500 PSI concrete instead of 3500 PSI.
__________________

jack14r is offline   Reply With Quote
Old 08-19-2012, 08:08 PM   #3
Dom Ferris
Senior Member
 
Dom Ferris's Avatar
 
Join Date: Aug 2012
Location: Logan, IA
Posts: 110
Default

Not if you like to look at big cracks!! I mean in the concrete. I wouldn't think of less than 6" with reinforcement. You could probaly hear 4" breaking under you.
__________________
1988 Newell Coach

Dom & Fay Ferris

Logan,IA
Dom Ferris is offline   Reply With Quote
Old 08-19-2012, 09:01 PM   #4
Retired63
Member
 
Join Date: Feb 2010
Posts: 56
Default

What's your sub-base (soil condition)? With the proper sub-base and 3000 psi fibered concrete 4" might be doable
__________________
I gave up health foods... at my age I need all the preservatives I can get.
Retired63 is offline   Reply With Quote
Old 08-20-2012, 03:02 AM   #5
Neweller
Senior Member
 
Neweller's Avatar
 
Join Date: Jan 2003
Location: Heartland
Posts: 3,563
Default

Jack14R and Retired63, you both have the right idea. I'm in the planning stages too on building either a 40 x 80 or 50 x 100 shop. I have been going over things with a contractor who is telling me I could split the slab in half with one half 6" thick and the other half 4" to save money. Of course the 6" thick would be for working on a Newell or equipment etc. Now the fiber reinforced concrete came up as a good option allowing me to go with a thinner slab than without. 3/8" rebar 12" on center is another option for superior strength. I would say the ultimate might be an 8" 4000 psi with fiber reinforcement. Which is spendy and probably overkill.

Ken
__________________
Ken
Previous Owner of 3 Newell's
Wanted: Newell Coach Needing Engine Replacement!
If you want to sell, PM or Private Message me. Thanks!


"I know I’m not perfect, and I don't live to be. But before you start pointing fingers, make sure your hands are clean."
-Bob Marley
Neweller is offline   Reply With Quote
Old 08-20-2012, 05:07 AM   #6
The Newell
Senior Member
 
The Newell's Avatar
 
Join Date: Dec 2005
Location: Southern California
Posts: 1,018
Default

As long as you have good preparation before you pour, and use the fiber reinforcement, you should be ok with the 4" slab even though I would recommend a 6" if it were me. The problem with concrete cracking is when it is on poorly prepared soil and/or not reinforced properly. Concrete generally cracks when there is movement beneath it, or it's uneven somewhere.

But if it really concerns you, pour an extra foot near the rear where the bulk of the weight will be.

I'm not an expert on concrete, but I did stay at a Holiday Inn Express last night
__________________
1976 Newell Classic (Sold)

Home Base: Riverside, CA

If anyone needs my contact info private message me and I will send it to you.

-Joseph-
The Newell is offline   Reply With Quote
Old 08-20-2012, 02:24 PM   #7
tuga
Senior Member
 
tuga's Avatar
 
Join Date: May 2006
Location: Houma, LA
Posts: 886
Default

I was at Newell factory, and they were breaking out a section of concrete that had many cracks. After the old concrete was broken out and removed new back fill was put in and leveled. For 8 hours a worker using a compactor machine packed down every inch of that area. The section of concrete was about 20' x 20'. I don't know how thick the area was but I would guess 12"!

The area that was prepared was in the middle of the driveway that had Newells rolling on it constantly all day - every day. My service work was finished before they poured the concrete so I didn't get to see how much re-bar was put in the section.

Personally, I believe that no matter how thick, or how much prep work is done - the concrete is going to crack. Of course I also believe that thicker is better and it should last longer.

Just my .02
__________________
Tuga & Karen Gaidry
1999 Newell 45 w/2 slides
Coach #512
2005 Pilot
tuga is offline   Reply With Quote
Old 08-20-2012, 09:58 PM   #8
smagown
Member
 
smagown's Avatar
 
Join Date: Jun 2008
Location: West Monroe, LA
Posts: 98
Default

I just built my shop, 40 x 60 with 5200 sq ft under roof. I used 5", rebar, fiber, and 27 8 ft pilings. Concrete alone was $16k. It hurt my feelings!
Thanks,
__________________
Steve Magown
West Monroe, LA
97 #458 w/3 roof airs, 07 997 GT3, 62 Vette,67 SS427 Chevelle, 02 Boxter, 74 GMC mtr hm, 88 Mastercraft 190 Prostar, 86 Ski Nautique 2000, 02 Baja Islander 212
smagown is offline   Reply With Quote
Old 08-20-2012, 11:16 PM   #9
The Newell
Senior Member
 
The Newell's Avatar
 
Join Date: Dec 2005
Location: Southern California
Posts: 1,018
Default

That is a nice size shop you built Steve. Did you set it up to accompany some fellow Newell owners? and if so do the cars come with the visit ?? lol just kidding Steve about the cars.
__________________
1976 Newell Classic (Sold)

Home Base: Riverside, CA

If anyone needs my contact info private message me and I will send it to you.

-Joseph-
The Newell is offline   Reply With Quote
Old 08-21-2012, 11:46 AM   #10
smagown
Member
 
smagown's Avatar
 
Join Date: Jun 2008
Location: West Monroe, LA
Posts: 98
Default

Thanks Joseph. I'm set up with full hookups for fellow Newells. Ron got a hot lap in the GT3, all grins!
Thanks,
__________________
Steve Magown
West Monroe, LA
97 #458 w/3 roof airs, 07 997 GT3, 62 Vette,67 SS427 Chevelle, 02 Boxter, 74 GMC mtr hm, 88 Mastercraft 190 Prostar, 86 Ski Nautique 2000, 02 Baja Islander 212
smagown is offline   Reply With Quote
Old 08-21-2012, 12:09 PM   #11
larryweikart
Senior Member
 
larryweikart's Avatar
 
Join Date: Feb 2006
Location: Iyopawa Island, Mi. (sometimes)
Posts: 421
Default

[ATTACH][/ATTACH]We built our storage facility in 2001 with 5", 3500psi concrete and adequate rebar and we have no cracks to date(knock on wood) It has a 8"X12" footer dug in around all outside walls. This is pretty good results considering the Mi. weather changes and the fact that we have the Coach, with trailer attached, stored together at a total weight of approx 65,000lbs. Our contractor spent substantial time preping the area before pouring. Hope this helps.
__________________
1994 Newell #365 w/Corvette, 2002 streetrod 34 ford golf cart, 2009 Smart Car, 1958 Century Coronado, 1965 Cruisers Inc, CAR & BOAT CRAZY! LOVE OUR NEWELL!
larryweikart is offline   Reply With Quote
Old 08-21-2012, 12:44 PM   #12
lbrachfe
Senior Member
 
lbrachfe's Avatar
 
Join Date: Jun 2011
Location: Home base is Palm Beach, Florida
Posts: 449
Default

Simply have your Newell weighed and contact a concrete company for the proper composition and PSI for your load and the proper depth and material for the sub base and as Tuga stated Prep is the key as it is in all construction. My guess from 35 years building is a sub base compacted to the freeze line or in warm climates 30". Use a minimum of 4500psi fiber laced concrete and 1/2 rebar boxed and wired in 24" pattern. Concrete depth depends on your natural base and fill, but no less than 6" depending on all other factors and score expansion joints in a pattern and more if you have a severe pitch. Good luck and you should be crack free....
__________________
Larry & Hedy Brachfeld
2003 Double Slide, Detroit 60
Coach # 646
lbrachfe is offline   Reply With Quote
Old 08-23-2012, 12:30 AM   #13
bigcatwally
Senior Member
 
bigcatwally's Avatar
 
Join Date: Apr 2012
Location: Colorado Springs, Colorado
Posts: 149
Default

Quote:
Originally Posted by larryweikart View Post
[ATTACH][/ATTACH]We built our storage facility in 2001 with 5", 3500psi concrete and adequate rebar and we have no cracks to date(knock on wood) It has a 8"X12" footer dug in around all outside walls. This is pretty good results considering the Mi. weather changes and the fact that we have the Coach, with trailer attached, stored together at a total weight of approx 65,000lbs. Our contractor spent substantial time preping the area before pouring. Hope this helps.
Larry nice building!
__________________
Wally & Barbie Zimmerman
Colorado Springs, Colorado

1979 Classic Newell Coach
1967 Ford Mustang
1969 Chevrolet El Camino SS
bigcatwally is offline   Reply With Quote
Old 08-24-2012, 09:33 AM   #14
FJGuard
Senior Member
 
FJGuard's Avatar
 
Join Date: Apr 2008
Location: Home base: New York
Posts: 136
Default

Wally's right! Larry you've got a nice place to keep the Newell from being out in the weather. Mind if I ask what it cost you for the setup?
__________________

FJGuard is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Mattress hard on the back, Help! stewart33 Interior Works 27 02-05-2016 06:43 AM

» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3
Disclaimer:

This website is not affiliated with or endorsed by Newell Coach Corporation or any of its affiliates. This is an independent, unofficial site.


All times are GMT. The time now is 11:20 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
×