Time needed to build - Luxury Coach Lifestyles
Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×
Reply
 
Thread Tools Display Modes
 
Old 10-04-2003, 01:21 AM   #1
Dennis
New Member
 
Join Date: Mar 2008
Posts: 2
Default Time needed to build

What is the approximate time needed to build a new coach, after an order is placed? Thanks.
__________________

Dennis is offline   Reply With Quote
Old 10-04-2003, 03:47 PM   #2
TechTalk
Senior Member
 
Join Date: Feb 2000
Posts: 304
Default

A coach ordered from scratch today would be scheduled for delivery around July 1 of next year. Currently, we have the owner's demonstrator and one new show coach in inventory for sale. In addition, a total of four unsold demonstators and show coaches are on the schedule between now and next summer. While some of the specifications are "locked-in" on these units, a number of the decor and optional equipment decisions are still flexible, depending on the time remaining before completion.
__________________
Hopefully this helps.
TechTalk is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

» Recent Threads
No Threads to Display.
» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3
Disclaimer:

This website is not affiliated with or endorsed by Newell Coach Corporation or any of its affiliates. This is an independent, unofficial site.


All times are GMT. The time now is 10:05 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
×